For solar and inverter companies
Know what was installed where, when the batteries went in, and what your technician found on the last visit.
5 kVA hybrid inverter · next service04 DEC 2026
With NODRO the answer is already on the machine’s record, with the date, the technician and the photos.
Field guide
What a good service visit covers. Share it with your team: in NODRO, technicians record what they found against each job, with notes, readings, parts and photos.
Typical intervals for Nigerian conditions. Always follow the manufacturer’s manual and adjust for heat, dust and how hard the machine works.
In NODRO, set each machine’s interval once and it shows on your dashboard when it’s due.
The calls your team gets most. Recording the same few things every time is what makes the next visit faster.
Usual causes: Overload, low battery voltage, overheating from blocked vents.
Record: The fault code on the display and the load connected at the time.
Usual causes: Ageing or mismatched batteries, deep discharge, loose terminals.
Record: Each battery’s voltage, and the installation date from the record.
Usual causes: Dirt, new shade from trees or buildings, a failed string or connector.
Record: A photo of the panels and the charge reading at midday.
SERVICE RECORD
5 kVA hybrid inverter
NEXT SERVICE DUE04 DEC 2026
Yes. Record the battery bank as one asset, or each battery on its own with its serial number and installation date, whichever suits how you warranty them.
Yes. Give the asset a service interval, for example every 2 months, and NODRO shows it as due on your dashboard when the time comes.
Warranty dates are kept on each asset for your team. The report your customer receives shows the work done, the technician and the next service date.